Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | DWSS (Installation of Hand Pump) at Malakana U/C Deolai | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
2 | DWSS (Installation of Hand Pump) at V/C Sirsenai U/C Bar Abakhel | 0.2438 | 4875 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
3 | DWSS/ HDPE Pipe at V/C Kuza Bandai-I-II-III U/C Kuza Bandai (Phase-I) | 0.3413 | 6825 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
4 | DWSS/ HDPE Pipe/ Construction of Water Tanks at V/C Taghma, Shalhand U/C Kalakalay | 0.4875 | 9750 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
5 | DWSS/ HDPE Pipe at V/C Lower Deolai-II-II, Nasrat U/C Deolai | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
6 | DWSS/ HDPE Pipe V/C Shah Dherai-I U/C Shah Dherai | 0.3413 | 6825 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
7 | DWSS (Installation of Hand Pump) College Colony V/C Chindakhwara Kabal U/C Bar Abakhel | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
8 | DWSS/ HDPE Pipe at V/C Dardyal-I-II, Bala Samai, Tall U/C Tall | 0.9750 | 19500 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
9 | DWSS (Installation of Hand Pumps) at V/C Kotlai, Dagai, Gadi, Dadahara U/C Kuz Abakhel | 0.9589 | 19178 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
10 | DWSS (Installation of Hand Pump) at Haji Patay U/C Hazara | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
11 | DWSS (Installation of Hand Pump) at Town, V/C & U/C Kanju | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
12 | Improvement of Roads (PCC) at V/C Hazara, Aligrama U/C Hazara | 0.9019 | 18038 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
13 | Cutting of Road at V/C Totano Bandai-I U/C Totano Bandai | 0.3413 | 6825 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
14 | Pavement of Streets/ Improvement of Roads (PCC) at V/C Damghar U/C Kanju | 0.4875 | 9750 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
15 | Pavement of Streets/ Construction of Drains/ Protection Wall at V/C Shah Dherai-I-II U/C Shah Dherai | 0.7800 | 15600 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
16 | DWSS (Installation of Hand Pump) HDPE Pipe V/C Ningolai U/C Bara Bandai | 0.3120 | 6240 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
17 | Pavement of Streets at V/C Dardyal-II U/C Tall | 0.3413 | 6825 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
18 | Pavement of Streets/ Drains at V/C Kotlai V/C Dagai V/C Gadi V/C Dadahara U/C Kuz Abakhel | 2.3340 | 46679 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
19 | Pavement of Streets at V/C Chindakhwara Kabal U/C Bar Abakhel | 0.1463 | 2925 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
20 | Pavement of Streets at V/C & U/C Hazara | 0.1950 | 3900 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
21 | Construction of Bab-e-Kabal at V/C Dadahara U/C Kuz Abakhel | 1.0477 | 20954 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
22 | Construction of Waiting Sheds at V/C Kotlai, Gadi, Dadahara, Dagai U/C Kuz Abakhel | 1.0477 | 20954 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
23 | Improvement of Roads (PCC)/ Protection Wall at V/C Totano Bandai-II U/C Totano Bandai | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
24 | Cutting of Roads at V/C Ghakhi Bandai U/C Totano Bandai | 0.3900 | 7800 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
25 | Improvement of Roads (PCC)/ Cutting of Roads at V/C Manja, Qalagey U/C Qalagey | 1.0072 | 20144 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
26 | Improvement of Roads (PCC) V/C Kuza Bandai-I-II-III U/C Kuz Bandai (Phase-I) | 0.8288 | 16575 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
27 | Pavement of Streets at V/C Kalakalay, Galoch, Taghma U/C Kalakalay | 0.6533 | 13065 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
28 | Improvement of Roads (PCC)/ Drains at V/C Kanju-I V/C Kanju-II U/C Kanju | 0.8775 | 17550 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
29 | Improvement of Roads (PCC) at Mohalla Nawab Ali at V/C Kuza Bandai | 0.4875 | 9750 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
30 | Construction of Protection Wall/ Bridge at Dherai Baba V/C Damghar U/C Kanju | 0.9263 | 18525 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
31 | Improvement of Roads (PCC) at V/C Lower Deolai-I-II, Sam Deolai U/C Deolai | 0.5850 | 11700 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
32 | Improvement of Roads (PCC) at V/C Aligrama U/C Hazara | 0.9019 | 18038 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
33 | Pavement of Streets at V/C Totano Bandai-I U/C Totano Bandai | 0.3413 | 6825 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
34 | Improvement of Roads (PCC) at V/C Bara Bandai-I-II, Ningolai U/C Bara Bandai | 1.1018 | 22035 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
35 | Improvement of Roads (PCC) at V/C Chindakhwara Kabal V/C Sirsenai U/C Bar Abakhel | 0.6240 | 12480 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
36 | Construction/ Improvement of Janazgah at V/C Dagai U/C Kuz Abakhel | 0.7800 | 15600 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
37 | Improvement of Roads (PCC)/ Pavement of Streets at V/C Kotlai, Dagai, Gadi, Dadahara U/C Kuz Abakhel | 1.9500 | 39000 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
38 | DWSS (Installation of Hand Pump)/ HDPE Pipe at Sar Khazana U/C Qalagey | 0.3900 | 7800 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
39 | Installation of Solar System in Civil Hospital Kabal U/C Bar Abakhel | 0.9750 | 19500 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
40 | Construction of Slab Culvert at Maloch U/C Hazara | 0.1950 | 3900 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
41 | Pavement of Streets (PCC) at U/C Kanju | 0.4875 | 9750 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
42 | DWSS at Sigram U/C Kuza Bandai | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
43 | Construction of Slab Culvert at U/C Kuza Bandai | 0.1950 | 3900 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
44 | Pavement of Streets (PCC) at Sarkhana U/C Bara Bandai | 0.1950 | 3900 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
45 | Pavement of Streets/ Roads at U/C Hazara | 2.9250 | 58500 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
46 | Construction of Water Tank at U/C Bara Bandai | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
47 | DWSS (Open Well & Hand Pumps) at U/C Bara Bandai | 1.9500 | 39000 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
48 | Construction of Boundary Wall of Graveyard at U/C Bara Bandai | 0.6825 | 13650 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
49 | Pavement of Streets (PCC) at V/C Galoch U/C Kalakalay | 0.5850 | 11700 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
50 | Pavement of Streets (PCC) at V/C Kalakalay U/C Kalakalay | 0.6825 | 13650 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
51 | DWSS (Supply & Fixing of 1/2 ”& ¾ ” Pipe) at V/C Taghma U/C Kalakalay | 0.6825 | 13650 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
52 | Pavement of Streets (PCC) at V/C Taghma U/C Kalakalay | 0.9750 | 19500 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
53 | Pavement of Streets (PCC) at U/C Shah Dherai | 2.3400 | 46800 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
54 | DWSS (Installation of Hand Pumps 02 Nos) at U/C Shah Dherai | 0.5850 | 11700 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
55 | Pavement of Streets (PCC) at U/C Deolai | 0.7800 | 15600 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
56 | Construction of Link Road at New Deolai U/C Deolai | 0.7800 | 15600 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
57 | Construction of Drains at U/C Deolai | 0.4875 | 9750 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
58 | DWSS (Supply & Fixing of HDPE Pipe) at U/C Deolai | 0.5850 | 11700 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
59 | DWSS (Installation of Hand Pumps) at U/C Deolai | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
60 | Pavement of Streets (PCC) at U/C Kuz Abakhel | 2.1450 | 42900 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
61 | DWSS (Supply & Fixing of ¾ ” HDPE Pipe) at U/C Kuz Abakhel | 0.4875 | 9750 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|
62 | DWSS (Installation of Hand Pump) at U/C Kuz Abakhel | 0.2925 | 5850 | 0 | |
2019-03-05 12:00 AM
| 14:00:00 | As per Work Order |
Download BOQ
|