Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | Water Tanks, Electric Motor pumps, pipe Village Council Pait | 1.2000 | 24000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work order |
Download BOQ
|
2 | Open Wells U.C Bandagai V.C Paito, Dehrai. | 0.9500 | 19000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
3 | Boring of Wells Timergara urban | 2.2000 | 44000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
4 | Improvement of Open Wells V.C Dehrai | 0.5500 | 11000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
5 | DWSS Open Well V.C Chinar Thangai. | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
6 | DWSS Open Well V.C Jabagai Fazal Abad | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
7 | DWSS Open Well Shingrai V.C Timergara urban No.2 | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:30:00 | As Per Work Order |
Download BOQ
|
8 | DWSS HDPE Pipes V.C Timergara urban No.1 | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
9 | Dwss Open Well Timergara V.C No.1 | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
10 | DWSS Open Well Timergara urban | 0.3000 | 6000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
11 | Impt; Open Well V.C Nasafa V.C Nora Khail | 0.6500 | 13000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
12 | Impt of Open Well Malak Taj Muhammad Korona Gumbat U/C Shahi Khail | 0.1600 | 3200 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
13 | Improvement of open well Fazal Hqani Korona V.C Gumbat Ziarat U/C Shahi Khail | 0.1600 | 3200 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
14 | Improvement of open well Amir Bahadar Korona V.C Pingal U/C Dush Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
15 | Impt: of Open Well Chaman Gul Korona V.C Otal U.C Shahi Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
16 | Impt: of Open Well Hamad Khan Korona V.C Matta U/C Nora khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
17 | Impt; of Open Well Sadiq Ullah Korona V.C Ajoo U/C Nora Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
18 | Impt of Open Well Bahadar Khan Korona karo Gumbatgay U/C Nora Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
19 | Impt of Open Well Dr. Aman Ullah Korona V.C Nasafa U.C Nora Khail | 0.1200 | 2400 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
20 | Impt of Open Well V.C Nagrai U/C Nora Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
21 | Construction of overhead tank Mohd Shah Khan Korona V.C Matta U/C Nora Khail | 0.1200 | 2400 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
22 | DWSS Open Well Hayat Ullah Korona Danwa | 0.2800 | 5600 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
23 | DWSS V.C Saddo | 0.1500 | 3000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
24 | Construction of StoreTank at Khungi Shah | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
25 | DWSS U/C Shahi Khail | 0.7000 | 14000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
26 | Boring of Well Kalpanai Talash | 0.6500 | 13000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
27 | Boring of well Khungi Shah | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
28 | Boring of Well Shekawlai Dabar | 0.3000 | 6000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
29 | Boring of Well Zara Dogai Shekhan | 0.1500 | 3000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
30 | Installation of Streets Lights at Talash Bazar | 1.8050 | 36100 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
31 | Installation or Streets Lights at Timergara Main Bazar | 7.2180 | 144360 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
32 | P.C.C Roads /Danga Wall patio & V.C Saddo and thrai | 1.3500 | 27000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
33 | Construction of kacha Road Tawda China | 0.4000 | 8000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
34 | PCC Road Chinarona V.C Kattan | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
35 | PCC Road Kattan V.C Katan | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
36 | PCC Road V.C Bagh | 0.5000 | 10000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
37 | PCC Road V.C Dehrai | 0.8000 | 16000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
38 | Construction of Danga Wall Ali Haider Korona Banda U/C Nora Khail | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
39 | Construction of Danga Wall Muslim Khan Korona Nasafa U/C Nora Khail | 0.1200 | 2400 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
40 | Construction of Culvert Sulaiman Korona Rahman Abad U/C Nora Khail | 0.1200 | 2400 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
41 | Construction of Culvert Kamangara Ajoo U/C Nora Khail | 0.1200 | 2400 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
42 | Construction of Kacha Road V.C Nasafa U/C Nora Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
43 | Construction of Kacha Road Khunako V.C Ajoo | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
44 | Construction of Kacha Road & Danga Wall Ajab Khan Korona Thangi Shamshi Khan U.C Shahi Khail | 0.1200 | 2400 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
45 | Construction of Danga Wall V.C Ajoo U/C Nora Khail | 0.1400 | 2800 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
46 | P.C.C Road Danwa | 0.1300 | 2600 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
47 | P.C.C Road V.C Siyar | 0.4000 | 8000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
48 | P.C.C Road V.C Saddo | 0.2500 | 5000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
49 | P.C.C Roads V.C Shekawlai | 0.4000 | 8000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
50 | P.C.C. Roads V.C Khungay | 0.3900 | 7800 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
51 | P.C.C Road/Streets U.C Shahi Khail | 1.4050 | 28100 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
52 | Construction work Mosque Paito | 1.0000 | 20000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
53 | Construction Work Mosque Markhano | 0.3000 | 6000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
54 | Improvement of janazgah V.C Pingal | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
55 | Construction work Mosques Otala V.C Otala | 0.2500 | 5000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
56 | Construction work Mosque Bagh | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
57 | Construction work Mosque Nagrai Munir Korona U.C Nora Khail | 0.1300 | 2600 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
58 | Construction work Mosque Ajoo U.C Nora Khail | 0.1800 | 3600 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
59 | Painting work of Mosque Matta U/C Nora Khail | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
60 | Construction work Usman Ghani Masjid Nasafa U.C Nora Khail. | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
61 | Construction work Mosque Bajawroo Khuna Kandaw U/C Bandagai. | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
62 | Construction of Toilets Masjid Shuw Baba U/C Shahi Khail | 0.1300 | 2600 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
63 | Construction of Protection Bund/Gril Grave yard V.C Ziarat | 0.4500 | 9000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
64 | Pavt; of Streets Tora Tiga Gat Chinar | 0.1300 | 2600 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
65 | Pavt; of Streets Village Council Pingal | 0.3000 | 6000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
66 | Pavt; of Streets V.C Kattan | 0.1500 | 3000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
67 | Pavt; of Streets V.C Bagh | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
68 | Pavt; of Streets otala V.C Otala | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
69 | Pavt; of Streets V.C Mian Banda | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
70 | Pavt; of Streets V.C Navai Kalai. | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
71 | Pavt; of Streets V.C Malak Abad | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
72 | Pavt; of Streets Zara Dogai Shekhan V.C Fazal Abad | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
73 | Pavt; of Streets Jabagai V.C Fazal Abad | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
74 | Pavement of Streets V.C Nasafa U/C Nora Khail | 0.7600 | 15200 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
75 | Pavement of Streets V.C Sarai Bala U/C Nora Khail | 0.5000 | 10000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
76 | Pavement of Streets V.C Nagrai U/C Nora Khail | 0.5000 | 10000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
77 | Pavement of Streets V.C Ajoo U/C Nora Khail | 0.4500 | 9000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
78 | Pavement of Streets V.C Banda U/C Nora Khail | 0.5000 | 10000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
79 | Pavt; of Streets V.C Thangay | 0.4000 | 8000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
80 | Pavt; of Streets Khungi Shah | 0.1000 | 2000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
81 | Construction of Drain/Foot Path near DHQ Hospital | 0.3350 | 6700 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
82 | Construction protection Band Timergara Urban | 0.3000 | 6000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
83 | Construction F.P Bund Usaman Korona Sarkari Dogai. | 0.2000 | 4000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | |
Download BOQ
|
84 | Improvement of General Bus Stand Timergara | 32.2880 | 645760 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
85 | Construction of Shed at TMA Office | 0.7550 | 15100 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
86 | Flooring of Tuff Tiles & Contruction of Bath Room at TMA Office | 0.8330 | 16660 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
87 | Boring of Wells TMA Office & Defunct M.C Offices | 0.6380 | 12760 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
88 | Improvement in Rest House Timergara | 0.4190 | 8380 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
89 | Improvement of TMA Land at Mian Banda | 1.4890 | 29780 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
90 | Impt; of Bunglow TMA Timergara | 0.5440 | 10880 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
91 | Solarization of TMA Office Timergara | 0.7870 | 15740 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
92 | Provision of Machinary for DWSS Shekhan Jabagai | 1.5000 | 30000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
93 | Construction work at Ahya-ul-Allom Balambat | 0.6000 | 12000 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
94 | Pipe Line Tora Taiga | 1.3010 | 26020 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
95 | Sanitation Scheme Timergara | 0.2820 | 5640 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|
96 | Impro: of MC Road Timergara Urban | 3.1720 | 63440 | 0 | |
2019-02-19 12:00 AM
| 14:00:00 | As Per Work Order |
Download BOQ
|