Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | CONSTTRUCTION OF APPROACH STREET TO BHU SAMARI | 0.7355 | 14710 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
2 | S/F Main gate & miscellaneous repair work at BHU Khaider khail | 0.7355 | 14710 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
3 | Construction/repair & Maintance work of Bathroom ,pressure pump,water tank and PCC work at BHU Ali kuch | 0.7355 | 14710 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
4 | S/F of Pressure pump/Hand pump At BHU Dartappi,Bhu doly banda & Bhu Shewaki sharif
UC Sudal | 0.7355 | 14710 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
5 | CONSTTRUCTION OF PPC ,RCC & Brick Work .Approches Street ,Drain at civil Hospital Shakardara | 0.7355 | 14710 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
6 | CONSTTRUCTION OF Compound & approches Street BHU Gabbari U c Shakardara R 2. | 0.7355 | 14710 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
7 | Construction :/desilting & rehabilation of pounds at UC shakardara Rural 2 | 0.5000 | 10000 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
8 | Construction Of approches Street /Road at to Govt School of Uc Summari, Solar Light from Registered Madrassa Noor Hamid at summari | 1.4711 | 29422 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
9 | PCC of approches streets of GGPS Mehmandi UC Mandoori RS 471100/- S/F of Hand pump at GGPS Mehmandi UC Mandoori,S/F of elertric water coolers at various Govt School uC mandoori | 1.4711 | 29422 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
10 | CONSTTRUCTION of PCC Approches Road GGPS Sanda fateh khan m& GGMS Darmalak | 1.4711 | 29422 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
11 | Brick pavement of school ground GHS Sudal & GPS Dhock mashal UC Sudal | 1.4711 | 29422 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
12 | Maintenance& repar work at govt school uc shakardara urban | 1.4711 | 29422 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
13 | PCC street /Road & drain of GMS chambai,GMS kamar dhand ,GMS jhan gul abad surgul | 1.4711 | 29422 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
14 | Protection band /wall at uc sumari ,Construction/Repair of janazagah at uc sumari, | 3.5900 | 71800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
15 | Repair of transformer at UC Mandoori S/f of 3 No of hand pump at uc mandoori. PCC Street drain culvert at uc Mandoori | 3.5900 | 71800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
16 | Pavement /PCC street drain,culvert,& Retaining wall at uc lachi Rular RS 1600000,
S/F of hand/ pump pressure pump at at various location in uc lachi rular 1990000 | 3.5900 | 71800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
17 | PCC road at vizo sam, dartapii,warshand uc sudal RS 1590000,
S/F of hand/ pump pressure pump at at various location in uc sudal 1500000 | 3.0900 | 61800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
18 | PCC of street ,drain,& slabs at shakardara urban. RS 1500000,
S/F of hand/ pump pressure pump at at various location in uc shakardara urban 1690000 | 3.0900 | 61800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
19 | Raising /strengthening of barrani dam at sarkidal uc shakardara rular 2 RS 1590000
S/F of hand pump & pcc pavement of street /Road at uc shakardara rular 2000000 | 3.5900 | 71800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
20 | PCC of street /road/drain/culvert at UC surgul | 3.5900 | 71800 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
21 | S/F OF HAND PUMPAT GOVT SCHOOLS IN SHAKARDARA. | 0.4000 | 8000 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
22 | Installation of Hand Pump/Pressure pumps at different areas of Shakardara | 1.1000 | 22000 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
23 | Construction of street at GGPS Inzarwala Banda Rs. 500000/-
Installation of pressure pumps at GGPS Darwazai. | 0.9510 | 19020 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
24 | PCC Road middle School kamar dhand RS 717016 PCC road middle school Chambai RS
717016 PCC road GGPS No 2 Surgul jahan gull abad 717016 | 2.1500 | 43000 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
25 | Construction of PCC street /drain at UC Jarma | 2.0950 | 41900 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
26 | Develpmental/Repair work in multipal school at shakar dara Rular 1 pcc ground pcc of school approches street Rcc roof bathrooms boundar wall door windows Plum concrete ,water tank co-curricular activities paints /white washing solar System lights fans ec | 1.7510 | 35020 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
27 | Rehabalitation of Black top road sanda fateh kaha road Ghurzandi | 15.0000 | 300000 | 0 | |
2018-12-24 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|