Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | EXCAVATION OF AGRICULTURAL PROTECTION BUND HAKIM SHAH ALIMAT KHEL UC AMA KHEL
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
2 | INSTALLATION OF PRESSURE PUMP MAJOR NASRULLAH BAZAI
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
3 | SOLARIZATION OF EXISTING BORE REHMAT IQBAL MULLAZAI
| 0.2500 | 5000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
4 | CONSTRUCTION OF WATER TANK ISLAMI MADRASSA ANWAR UL ULOOM MOLVI GUL MUHAMMAD
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
5 | INSTALLATION OF PRESSURE PUMP, HAND PUMP TEHSIL AREA TANK
| 2.5000 | 50000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
6 | INSTALLATION OF SUBMERSSIBLE PUMP, UC AMA KHEL, PAI, MULLAZAI, GUL IMAM
| 2.5000 | 50000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
7 | CONSTRUCTION OF SHINGLE ROAD TEHSIL AREA TANK
| 3.0000 | 60000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
8 | EXCAVATION OF CIVIL WAND VC NASRAN
| 3.5000 | 70000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
9 | CONSTRUCTION OF PIPE CULVERTS TEHSIL AREA, TANK
| 2.0000 | 40000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
10 | SOLARIZATION OF EXISTING BORE KIRI ITWARI 4 NO.
| 0.4000 | 8000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
11 | INSTALLATION OF PRESSURE PUMP TEHSIL AREA TANK
| 2.5000 | 50000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
12 | INSTALLATION OF 01 NO. PRESSURE PUMP MASJID WANDAZALLO C/O FAYAZ AHMAD
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
13 | CONSTRUCTION OF PCC STREET DABARA
| 0.5500 | 11000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
14 | INSTALLATION OF 03 NO. PRESSUR PUMPS UC DABARA
| 0.4500 | 9000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
15 | CONSTRUCTION OF 02 NO. WATER TANKS ZAFRAN MIANI AND IHSAN EACH 50000
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
16 | CONSTRUCTION OF 04 NO. WATER TANKS
| 0.4000 | 8000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
17 | CONSTRUCTION OF WATER TANK HAFIZ GUL NAWAZ 150000 AND KAMAL MAZYANI 80000
| 0.2300 | 4600 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
18 | CONSTRUCTION OF PCC STREET
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
19 | CONSTRUCTION OF SHINGLE ROAD
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
20 | INSTALLATION OF 01 NO. 12" PIPELINE 8" AND HP MACHINE
| 0.4000 | 8000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
21 | INSTALLATION OF 02 NO. PRESSURE PUMP BURSIS DABBARA
| 0.4000 | 8000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|
22 | SHINGLE ROAD ZUBAIR KOROONA DABBARA
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | As per work order |
Download BOQ
|