Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | INSTALLATION OF 07 NO. PRESSURE PUMPS HAMEED ULLAH, REHMAT ULLAH, HAROON, DILAWAR, SHOAIB, FAZAR REHMAN, LOHAN KHEL AND SADIR ULLAH EACH 50000 | 0.3600 | 7200 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
2 | INSTALLATION OF SOLAR SYSTEM, ELECTRIFICATION, PLUMBING WORK TO EXISTING COMMUNITY CENTER TAJORI
| 0.7000 | 14000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
3 | INSTALLATION OF 01 NO. BORE PIPE DIA 8" DEPTH 600 INCLUDING MOTOR PUMP AMIR UMAR TAJORI
| 0.7000 | 14000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
4 | CONSTRUCTION OF AGRICULTURAL PROTECTION BUND MIRAK KACH
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
5 | CONSTRUCTION OF MOHA VILLAGE COUNCIL TAJORI BARAKAT
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
6 | CONSTRUCTION OF WATER TANK 12 NO. VILLAGE COUNCIL RAGHZA AND GOMAL TANK
| 1.2000 | 24000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
7 | INSTALLATION OF 05 NO. PRESSURE PUMPS UC GOMAL VC RAGHZA MAJHI TANK EACH 200000
| 1.0000 | 20000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
8 | COMMUNITY CENTER AT TEHSIL TANK
| 0.7000 | 14000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
9 | CONSTRUCTION OF 10 NO. WATER TANKS VC NASRAN TANK
| 0.0700 | 1400 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
10 | INSTALLATION OF PRESSURE PUMP ANWAR DAUD KHEL
| 2.0000 | 40000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
11 | INSTALLATION OF 02 NO. PRESSURE PUMP UC DABARA MOHAJIR CAMP
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
12 | INSTALLATION OF SOLAR SYSTEM TO EXISTING BORE UC SARONGZANA
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
13 | CONSTRUCTION OF BRICK STREETS INCLUDING DRAIN (1X1)
| 0.4500 | 9000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
14 | CONSTRUCTION OF 07 NO. WATER TANK FOR RIZWAN BALOCH (100000) JAVID ARRAIN (100000) IHSAN BATANI, SHEIKH REHMAT, AMAN ULLAH MARWAT, ARSHAD AYUB, REHMAT TRAFFIC INCHARGE EACH 60000
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
15 | INSTALLATION OF PIPE DIA 2"
| 0.0600 | 1200 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
16 | INSTALLATION OF 02 NO. PRESSURE PUMPS VC ABIZAR
| 0.1200 | 2400 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
17 | 10 NO. WATER TANKS UC PAI EACH 60000
| 0.6000 | 12000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
18 | CONSTRUCTION OF JANAZGAH AT TEHRAN KOI
| 0.1500 | 3000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
19 | INSTALLATION OF 08 NO. PRESSURE PUMPS
| 0.4400 | 8800 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
20 | CONSTRUCTION OF 02 NO. MOHA
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
21 | 01 NO. BORE 10" 300' VC NASRAN
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
22 | INSTALLATION OF 08 NO. PRESSURE PUMPS
| 0.3900 | 7800 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
23 | INSTALLATION OF PRESSURE PUMP QIBLA KHAN TAJORI TANK
| 0.1300 | 2600 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
24 | CONSTRUCTION OF WATER TANK SHAH WALI SHO WANDAZALLA
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
25 | INSTALLATION OF PRESSURE PUMP HAJI NASEER MUHAMMAD AKBAR
| 2.0000 | 40000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
26 | INSTALLATION OF 02 NO. PRESSURE PUMP MALAK IMRAN
| 0.2500 | 5000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
27 | INSTALLATION OF SOLAR SYSTEM TO EXISTING BORE UC SARONGZANA
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
28 | construction of community center 02 rooms including bathroom, veranda, boundary wall and main gate
| 1.5000 | 30000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
29 | CONSTRUCTION OF CULVERT SHINGLE 4X4X23
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
30 | INSTALLATION OF 02 NO. PRESSURE PUMPS VC DABARA
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
31 | SOLARIZATION OF EXISTING IRRIGATION BORE AT TAJORI SAM ABADI
| 0.7000 | 14000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
32 | SOLARIZATION OF BORE URDU KALA DABARA TANK
| 0.8000 | 16000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
33 | INSTALLATION OF 05 NO. PRESSURE PUMPS DABARA TANK
| 0.7500 | 15000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
34 | CONSTRUCTION OF WATER TANK HAFIZ GUL NAWAZ MAZYANI
| 0.1500 | 3000 | 0 | |
2019-06-25 12:00 AM
| 14:00:00 | as per work order |
Download BOQ
|
35 | PURCHASE OF 30 NO. PLASTIC TANKS
| 0.3500 | 7000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
36 | CONSTRUCTION OF 01 WATER TANK FOR MASTER QAIZER KHAN GUL IMAM
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
37 | INSTALLATION OF HAND PUMP / WATER TANK SHAKEEL GUL IMAM
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
38 | CONSTRUCTION OF RETAINING WALL
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
39 | INSTALLATION OF PRESSURE PUMP
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
40 | CONSTRUCTION OF PCC STREET
| 0.9000 | 18000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
41 | CONSTRUCTION OF WATER COURSE MOHA
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
42 | CONSTRUCTION OF 01 WATER TANK FOR MASTER QAIZER KHAN GUL IMAM
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
43 | CONSTRUCTION OF WATER TANK FOR NAJEEB ULLAH GUL IMAM
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
44 | INSTALLATION OF WSS MALAK MIR SARDAR CHESSAN KACH 7000' DEPTH 6"
| 1.3000 | 26000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
45 | CONSTRUCTION OF ADDITIONAL ROOM ISLAMI MADRASA SHAH GUL KHEL
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
46 | SOLARIZATION OF EXISTING MINORITY HOUSE INCLUDING ELECTRIFICATION
| 0.6000 | 12000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
47 | CONSTRUCTION OF 02 NO WATER TANK SHAHEER AND SOHAIL
| 0.1200 | 2400 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
48 | CONSTRUCTION OF 02 NO. WATER TANKS MOVEED AND AURANGZEB
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
49 | CONSTRUCTION OF PCC STREET WITH DRAIN NC CIVIL LINE TANK
| 0.2500 | 5000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
50 | INSTALLATION OF PR/PUMP NISAR AHMAD RAZAQ COLONY
| 0.0700 | 1400 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
51 | CONSTRUCTION OF WATER TANK FOR FARHAD KOROONA MIA LAL TANK
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
52 | SOLARIZATION OF EXISTING BORE AND WATER PIPE AND WATER TANK GHULAM UD DIN AZAM ABAD
| 0.4000 | 8000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
53 | INSTALLATION OF 01 NO. PRESSURE PUMP HAFIZ ALAM SHAH AMA KHEL
| 0.0700 | 1400 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
54 | CONSTRUCTION OF AGRICULTURAL PROTECTION BUND KHIAL MUHAMMAD DAUD KHEL
| 1.7000 | 34000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
55 | EXCAVATION OF WAND AT VILLAGE DAUD KHEL ADNAN ZIA
| 0.9000 | 18000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
56 | INSTALLATION OF 02 NO. PRESSURE PUMP JUNAID IN VC KIRY AHMAD SHAH TANK
| 0.4000 | 8000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
57 | INSTALLATION OF BORE INCLUDING SOLARIZATION 10" DIA, 6" PIPELINE AND 250' DEPTH SABZ ALI KOROONA DAUD KHEL
| 0.8000 | 16000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
58 | CONSTRUCTION OF AGRICULTURAL PROTECTION FOR REHMAT SHAH DAUD KHEL
| 0.6000 | 12000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
59 | CONSTRUCTION OF PCC STREET ABDUL QADIR MIANI SABIR ABAD
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
60 | CONSTRUCTION OF PCC STREET REHMAT ALI KOROONA
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
61 | CONSTRUCTION OF PCC STREET UMAR FAROOQ NEAR LAL KHAN MASJID SABIR ABAD
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
62 | INSTALLATION OF PIPELINE SABIR ABAD DIA 2"
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
63 | REPAIR OF STREET GUL ZAMAN ARRAIN
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
64 | REPAIR OF STREET INAYAT ULLAH MASHOOD SABIR ABAD
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
65 | REPAIR OF STREET PIR GUL WALI NEAR SABIR ZIARAT
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
66 | CONSTRUCTION OF PCC STREET GHULAM DASTAGIR S/O KHALIQ DAD KHUDRIANWALA
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
67 | WATER BORE VILLAGE RAGHZA
| 1.4000 | 28000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
68 | CONSTRUCTION OF WATER TANK 10 NO.
| 0.6000 | 12000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
69 | 02 NO. PRESSURE PUMP ZAUTA KHAN AND HUMAYUN KOT KAT
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
70 | 02 NO. WATER TANKS SHAUKAT AND BALAT KHAN KOT KAT
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
71 | 01 NO. PRESSURE PUMP GARAH BALOCH MUHAMMAD GHULAM PRESS
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
72 | WATER TANK SHAUKAT KHAN KUNDI
| 0.1000 | 2000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
73 | 01 NO. BORE MALIK OBAID ULLAH KHAN BATANI ABA KHEL
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
74 | STREET MUHAMMAD RAMZAN BAMB
| 0.2000 | 4000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
75 | PURCHASE PLASTIC TANKS
| 2.0000 | 40000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
76 | EXCAVATION OF CIVIL WAND NASRAN DAUD KHEL AND LANGER KHEL
| 2.5000 | 50000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
77 | SOLARIZATION OF EXISTING BORE MUHAMMAD FAROOQ SARANG
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
78 | SOLARIZATION OF EXISTING BORE SHER ALI
| 0.5000 | 10000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
79 | INSTALLATION OF 02 NO. PRESSURE PUMP 6" WITH SOLARIZATION ARIF EACH 4 LAC
| 0.8000 | 16000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | |
Download BOQ
|
80 | INSTALLATION OF 01 NO. TUBE WELL 10" SAIF ULLAH SARANG KOROONA
| 0.7000 | 14000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
81 | INSTALLATION OF PIPELINE DIA 4" ALMARJAN LAKKY MECHAN KHEL TANK
| 0.3000 | 6000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|
82 | PCC STREET GARAH BALOCH
| 2.2000 | 44000 | 0 | |
2019-06-25 12:00 AM
| 12:00:00 | as per work order |
Download BOQ
|