Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Tender Form(Rs.) | Required PEC Category | Last Date / Time of online apply | Date / Time of Opening | Time Limit | Download BOQ |
1 | Installation of Pressure Pumps at Karak North & South
| 2.0750 | 41500 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
2 | Construction of Water Storage Tank and Installation of Pipeline at UC Latamber
| 1.5000 | 30000 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
3 | Installation of Pressure Pumps at UC Latamber
| 1.0000 | 20000 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
4 | Installation of Pressure Pumps at Karak South
| 1.0000 | 20000 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
5 | Kacha Track / PCC near Kurpali Woot Ground for Inam Koroona
| 0.6150 | 12300 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
6 | Solarization of already installed Pressure Pumps at UC Latamber
| 1.9000 | 38000 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|
7 | Construction of Drains for Paracha Koroona Surdog and Karmi Khel Koroona
| 1.0000 | 20000 | 0 | |
2019-04-25 12:00 AM
| 14:00:00 | As per work order |
Download BOQ
|