Terms & conditions
-
Tender Form/ BOQ can be downloaded after publication in the newspapers by the original registered contractors from Local Council Board website. (www.lgkp.gov.pk)
-
The Government of Khyber Pakhtunkhwa, Local Government, Elections & Rural Development
Department (Local Council Board), Peshawar to insure maximum transparency in the process of existing E-Tendering System by introducing E-Bidding System and circulated vide Notification No.AOI/LCB/Estt:/19-6/2017 dated 19/06/2017 that all the Local Councils in the Province of Khyber Pakhtunkhwa shall offer their contracts through new E-Tendering System.
-
All the enlisted contractors of Local Council Board shall offer their bids by filling rates online with effect from 01/07/2018.
-
The contractors quoting their bids up to a limit of 15% below Engineer estimate shall submit bid security to the extent of 2% of Engineer Estimate only.
-
The contractors quoting their bids more than 15% below on Engineer’s Estimate shall submit along with their bids an Additional Security to the extent of their bid/rates more than 15% below on engineer estimate in the form of percentage.
-
In case the bidder quotes more than 15% below the Engineer Estimate and the bid is not accompanied by the Additional Security then the bid shall be considered as non-responsive and the 2nd lowest bidder and so on will be considered accordingly.
-
In case a contractor quotes more than 30% below on Engineer Estimate, the procuring entity shall, in addition to additional security, require the contractor to produce detailed rate analysis of his bid price in relation to any or all the items of bill of quantities, scope of work, allocation of risks and responsibilities and/or any other requirements of the bid solicitation document. The contract shall be awarded to the lowest evaluated bidder who has satisfied the procuring entity on rate analysis. However, if the procuring entity determines that the contractor has failed to demonstrate its capability to execute the contract at the offered price,
the matter shall be referred to the next higher authority for rejection of the bid on the basis of being financially unviable.
-
The procuring entity may offer the contract to next lowest bidder after due diligence in the context of financial difference between such two bids or may advertise procurement opportunity afresh.
-
After commencements of work by the successful bidder, the procuring entity may replace the Additional Security with a bank guarantee of the same amount from the scheduled bank; if the already deposited security is not in the form of bank guarantee.
-
The Additional Security shall be released to the contractor in four installments that is 25% to be released upon completion of 25% of the project, 50% to be released upon completion of 50% of the project, 75% to be released upon completion of 75% of the project and the remaining amount to be released after completion of the project.
-
All previous orders, instructions and regulations issued regarding additional security shall stand superseded
-
Those who will not succeed will receive there CDR after the Award of tender
-
All the enlisted contractors have an option to withdraw their bids online upto closing time of tender if they intend not to participate in biding. In case they have applied rates online then they shall be compelled to submit printed tenders documents along with requisite documents to TMA Pabbi, otherwise will be liable to be declared as black listed.
-
The documents must be attached with the bids such as i) 2% Earnest Money in shape of original Call Deposit in the name of Tehsil Municipal Officer TMA Pabbi From the Company Account & from scheduled banks, ii) Enlistment copy of Local Council Board for the year 2021-22, iii) Registration copy of KPRA 2021-22 (Khyber Pakhtunkhwa Revenue Authority) iv) copy of CNIC for each scheme in a separate envelope by register Courier highlighting name of work (written over the envelope).
-
The Engineer Estimates are framed on the MRS-2021.
-
The Tender Forms and BOQs must be signed by the original contractor.
-
The successful contractors have to pay stamp duty alongwith contingency charges and all applicable Provincial/ Federal Government taxes issued from time to time.
Bid security of some or all the bidders will be retained by the employer till approval of Tender/ Bid validity period.
-
Complete bids both (Original and Duplicate) must reached to the TMA Pabbi on or before the fixed date/ time and the duplicate copy will be sent to the Local Council Board, Peshawar through special messenger by TMA Pabbi as per instructions of the Provincial Government.
-
Incomplete/ conditional or telegraphic tenders shall not be accepted.
-
The Department will not bound to provide any machinery/ testing laboratory and the total cost on it will be borne by the contractors themselves.
-
Any bidder who provides incorrect information should be disqualified.
-
In case of bids become tie the award of contract shall be decided through a free toss which shall be binding and final.
Note:
The contractor/firm who have not withdrawn the bid till closing time form E-Tender and failed to submit the documents to TMA, Pabbi, will be black listed.
The contractor/firm who submitted fake documents, will be considered as black listed.
The contractor/firm, who succeeded for the applied work, will be responsible for execution of work and if he/it failed to do so, will also be considered as black listed, and his/its securities will be forfeited in favor of TMA, Pabbi.
Contractor will apply online for tender as per new policy of Local Council Board.