Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Last Date / Time of Submission of Tender Forms | Date / Time of Opening | Time Limit | Address of NC / VC | Download BOQ |
1 | Pavements of streets ,Tufftel,culverts, Drains & Construction of R/Wall etc at VC Ghari Hazrat Khel | 1.4555 | 29110 |
26-Feb-2019
| 14:00:00 | As per work order | |
Download BOQ
|
2 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Baba Khel/ Ali Khel | 1.1550 | 23100 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
3 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Baba Khel/ Ali Khel | 1.0100 | 20200 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
4 | Pavements of streets ,Grill on Drains,w/suppiy,culverts, & Construction of R/Wall etc at VC Dhanda | 1.6975 | 33950 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
5 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Chapai Maizara | 1.4000 | 28000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
6 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Chapai Maizara | 1.0250 | 20500 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
7 | Pavements of streets , Tuff tel,Drains,culverts, & Construction of R/Wall etc at VC Muslim Abad/Khadim Abad | 1.6975 | 33950 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
8 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Nal gunyar | 1.2000 | 24000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
9 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Nal gunyar | 1.2250 | 24500 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
10 | Pavements of streets , Hand pumps,Drains ,culverts,& Construction of R/Wall etc at VC Hibat Gram | 1.4000 | 28000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
11 | Construction of ,janazgah,etc at VC Jalala | 1.6975 | 33950 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
12 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at VC Bazid Khail | 1.1825 | 23650 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
13 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Bazid Khail | 1.0000 | 20000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
14 | Pavements of streets ,culverts, Drains & Construction of R/Wall,instalation of Pressure/Hand pump etc at VC Palai Shahkot | 1.4540 | 29080 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
15 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at VC Sher Khana /Zoor Mandai | 1.2125 | 24250 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
16 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at VC Sher Khana /Zoor Mandai(2) | 1.2125 | 24250 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
17 | Pavements of streets ,culverts, Drains & Construction of R/Wall& installation of pressure/Hand pump etc at VC Bazdara Bala & Payeen(1) | 1.4550 | 29100 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
18 | Pavements of streets ,culverts, Drains & Construction of R/Wall& installation of pressure/Hand pump etc at VC Bazdara Bala & Payeen(2) | 1.4550 | 29100 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
19 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Khan palo | 1.0000 | 20000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
20 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Khan palo(2) | 1.1000 | 22000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
21 | Pavements of streets , Drains & Construction of R/Wall, etc at VC Khan palo ADP 2016-17(Saving) | 0.2471 | 4942 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
22 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Said Abad(1) | 1.4000 | 28000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
23 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Said Abad(2) | 0.6913 | 13825 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
24 | Pavements of streets , Drains & Construction of R/Wall etc at VC Said Abad ADP 2016-17 (Saving) | 0.3736 | 7472 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
25 | Pavements of streets ,culverts, Drains & Construction of R/Wall & Boundary wall etc at VC Baro | 1.3978 | 27955 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
26 | Pavements of streets , Drains & Construction of R/Wall & Boundary wall etc at VC Baro ADP 2016-17 (Saving) | 0.2859 | 5718 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
27 | Pavements of streets ,culverts, Drains & Construction of R/Wall & Boundary wall etc at VC Cheshti Baba(1) | 1.3390 | 26780 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
28 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Cheshti Baba(2) | 0.7910 | 15820 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
29 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Cheshti Baba ADP 2016 17 (Saving) | 0.7375 | 14750 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
30 | Pavements of streets ,culverts, Drains & Construction of R/Wall& installation of pressure/Hand pump etc at VC Fazal Abad | 1.4000 | 28000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
31 | Pavements of streets ,w/s, Drains & Construction of R/Wall etc at VC Fazal Abad ADP 2016 17(Saving) | 0.4176 | 8352 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
32 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Amandara(1) | 1.1650 | 23300 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
33 | Pavements of streets , culverts,Drains & Construction of R/Wall ,garbage/etc at VC Amandara(2) | 0.9320 | 18640 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
34 | Pavements of streets , Drains & Construction of R/Wall etc at VC Amandara ADP 2016-17 (Saving) | 0.3459 | 6918 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
35 | Providing & Installation of Solar Street Lights at NC Bala Batkhela | 0.9300 | 18600 |
26-Feb-2019
| 21:00:00 | As per Work order | |
Download BOQ
|
36 | Pavements/ Repairing of streets , Drains ,Construction of R/Wall & WSS etc at NC Pir Khushal Baba | 1.8400 | 36800 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
37 | Pavements of streets , Drains etc at NC Pir Khushal Baba (ADP 2016-17 Saving) | 0.1300 | 2600 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
38 | Pavements of streets , Drains & Construction of R/Wall,Culverts & Installation of Hand /Pressure Pump etc at NC New Batkhela | 1.8500 | 37000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
39 | Pavements of streets , Drains , Construction of R/Wall , & WSS etc at NC Din Abad | 1.4200 | 28400 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
40 | Pavements of streets , Drains , Construction of R/Wall , Grill etc at NC Din Abad (ADP 2016-17 Saving) | 0.1960 | 3920 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
41 | Pavements of streets , Drains , Construction of R/Wall & Installation of Hand/ Pressure Pump etc at NC Ibrahim Khail | 1.1390 | 22780 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
42 | Pavements of streets , Drains , Construction of R/Wall & Installation of Hand/ Pressure Pump etc at NC Madai Khail | 1.6500 | 33000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
43 | Pavements of streets , Drains & Construction of R/Wall ,Culverts etc at NC Saman Abad | 1.3350 | 26700 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
44 | Construction of R/Wall at NC Saman Abad (ADP 2016-17 Saving) | 0.3250 | 6500 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
45 | Pavements/ Repairing of streets , Drains ,Construction of R/Wall & WSS etc at NC Akbar Abad | 1.2620 | 25240 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
46 | Pavements of streets , Drains, Construction of R/Wall ,Culverts etc at VC Maizara | 1.6975 | 33950 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
47 | Pavements of streets ,culverts, Drains & Construction of R/Wall& WSS etc at VC Noor Muh. Khail | 0.9775 | 19550 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
48 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Noor Muh. Khail ADP 2016-17(Saving) | 0.1000 | 2000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
49 | Pavements of streets , culverts,Drains & Construction of R/Wall,installation of pressure/Hand pump etc at VC Mucha Khail . | 1.7000 | 34000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
50 | Pavements of streets , Drains & Construction of R/Wall, etc at VC Mucha Khail ADP 2016-17(Saving) | 0.3000 | 6000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
51 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at VC Kotkay | 1.5575 | 31150 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
52 | Pavements of streets , Drains & Construction of R/Wall etc at VC Malakand | 1.4550 | 29100 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
53 | Pavements of streets , Drains & Construction of R/Wall ,Culvert , WSS & Cutting etc at VC Piran | 1.6800 | 33600 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
54 | Pavements of streets , Drains , Construction of R/Wall & Installation of Pressure/Hand Pump etc at VC Jalal Kot | 1.6975 | 33950 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
55 | Pavements of streets ,culverts, Drains & Construction of R/Wall & Instalation of Hand pump etc at VC Bara Atya Dheri | 1.2100 | 24200 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
56 | Pavements of streets , Drains & Construction of R/Wall & etc at VC Bara Atya Dheri ADP 2015-16-2016-17 (Saving) | 0.1984 | 3968 |
26-Feb-2019
| 14:00:00 | | |
Download BOQ
|
57 | Pavements of streets , Drains & Construction of R/Wall & etc at VC KUZ Atya Dheri ADP 2015-16-2016-17 (Saving) | 0.2654 | 5308 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
58 | Pavement of steerts,culverts,Drains,culverts& construction of R/Wall,installation of Pressure/Hand pump etc at VC Kuz Atya Dheri | 1.4595 | 29190 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
59 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at VC Julagram | 1.8500 | 37000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
60 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Julagram ADP 2016-17 (Saving) | 0.6000 | 12000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
61 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at VC Mubarak Khail | 1.6000 | 32000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
62 | Pavements of streets ,culverts, Drains & Construction of R/Wall ,boundary walletc at VC Ismail Khail | 1.8000 | 36000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
63 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Matkanai | 1.2880 | 25760 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
64 | Pavements of streets , Drains & Construction of R/Wall etc at VC Pirkhail | 1.5988 | 31976 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
65 | Pavements of streets , Drains & PCC Road etc at VC Mekhband | 1.5500 | 31000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
66 | Pavements of streets , Drains & Construction of R/Wall etc at VC Qulangai | 1.8225 | 36450 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
67 | Pavements of streets , Drains ,Construction of R/Wall , Cutting ,WSS & Installation of Hand pump etc at VC Loya Agra | 1.6000 | 32000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
68 | Pavements of streets , Drains ,Construction of R/Wall ,Graveyard ,Janazgah ,WSS & Installation of Pressure Pump et at VC Kama Agra | 1.5000 | 30000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
69 | Pavements of streets , Drains ,Construction of R/Wall ,Janazgah ,WSS & Installation of Pressure Pump etc VC Inzergai | 1.7750 | 35500 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
70 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Khanorai | 1.4555 | 29110 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
71 | Pavements of streets ,wss,w/tank,kacha road, Drains & Construction of R/Wall,installation of pressure/Hand pump etc at VC Dheri/Silai Patay | 1.4150 | 28300 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
72 | Pavements of streets , culverts,Drains & Construction of R/Wall ,installation of pressure/Hand pump,etc at VC Totai | 1.8400 | 36800 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
73 | Pavements of streets ,culverts, Drains & Construction of R/Wall,instaiiation of pressure/Hand pump etc at VC Kot | 1.0325 | 20650 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
74 | pavement of streets, drains,culverts,& construction of R/Wall etc at VC KOT 2 | 1.0000 | 20000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
75 | Pavements of streets ,Culverts, Drains & Construction of R/Wall etc at VC Mungai 1 | 1.0000 | 20000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
76 | Pavements of streets ,Culverts, Drains & Construction of R/Wall etc at VC Mungai 2 | 1.0700 | 21400 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
77 | Pavements of streets ,Culverts, Drains & Construction of R/Wall etc at VC Maina | 1.4225 | 28450 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
78 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Dargai patak Jaban | 1.9750 | 39500 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
79 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Dargai patak Jaban ADP (2016-17 Saving) | 0.4000 | 8000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
80 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Village Dargai 1 | 1.4550 | 29100 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
81 | Pavements of streets , culverts,Drains & Construction of R/Wall etc at NC Village Dargai 2 | 1.1560 | 23120 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
82 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Petaw | 1.2000 | 24000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
83 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Qaldara 1 | 1.8000 | 36000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
84 | Pavements of streets , Drains & Construction of R/Wall etc at NC Qaldara 2 | 0.4000 | 8000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
85 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Kharkai 1 | 1.1675 | 23350 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
86 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Kharkai 2 | 1.3000 | 26000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
87 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Dargai Bazar | 1.8205 | 36410 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
88 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at NC Dargai Bazar ADP 2016-17 (Saving) | 0.8000 | 16000 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|
89 | Pavements of streets ,culverts, Drains & Construction of R/Wall etc at VC Dobandai 1 | 1.0625 | 21250 |
26-Feb-2019
| 14:00:00 | As per Work order | |
Download BOQ
|