Sealed tender for below mentioned works are hereby invited from Govt: Contractors enlisted with LG&RDD/PEC in the relevant category and having registration/enlistment renewal for the current year as per following schedule.

Work NoWork NameEstimated Cost (Millions)Earnest Money(Rs.)Last Date / Time of Submission of Tender FormsDate / Time of OpeningTime LimitAddress of NC / VCDownload BOQ
1Package No 1 UC Bagh (1.3M) 1 Shingle road to khan Afsar Bheeran 0.3 2 PCC road M.Afsar Moh: Passali 0.3 3 Widening of road gali Beensa 0.3 4 Shingle road to Moh: ghari 0.1 5 PCC way to sultan mast Rontian 0.1 6 PCC way to graveyard masjid bhokrey 0.2 1.300026000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
2Package No 2 UC Bagh (1.13M) 7 Shingle road to Molve sb aslam teeper 0.2 8 Shingle road to Abdur Razzaq haveli 0.15 9 PCC way to Chenzeb house to Jhugian 0.2 10 Water supply line to Ashrif Moh: dorh 0.05 11 Shingle road from Treri to Nulla 0.25 12 Shingle road to shakeel member nakka 0.28 1.130022600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
3Package No 3 UC Baldheri (1.95M) 13 B/I Of H/pump (Moh: Morkalan Awal Khan, Banaras Khan) Moh: Mast Maira Javed Khan) Moh: Baldheri Chanzeb s/o Ali Asgher, Masood Akhtar, Dilawar, Asim s/o Sarwar Khan, Shawal Khan) Shoaib Khan Baldheri, Shamrez Batang Mera, Yamin Mera Batang 1.3 14 Install of H/pump near h/o Khair Muhammad Dhakhan Dakhli Tannan 0.1 15 PCC Street Tarhana Malkan from Nae Basti Main Road to Shakeel House 0.1 16 PCC Street Ali Asgher Sian da Katha 0.15 17 PCC Road for Maddrasa Baldheri 0.15 18 PCC Street Ijaz Shah from Chitta Maira to Baldheri 0.15 1.950039000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
4Package No 4 UC Baldheri (1.6M) 19 PCC Road Amjid Khan Tannan 0.2 20 PCC Road Shoukat Khan Tannan 0.19 21 PCC Road Jharian di Mohri Daroo Khan 0.19 22 PCC Drain/Const & Repair Christian Colony Qalandar Abad Phase-III 0.3 23 PCC road Naeem Khan & Munir Khan Baldheri Sian da Katta Baldheri 0.2 24 P/I of Hand Pumps Master Azeem khan 0.13 25 P/I of Hand Pumps Naeed Khan 0.13 26 P/I of hand pumps Sarwar Khan Jalla Pura 0.13 27 P/I of Hand Pumps Basharat Khan Baldheri 0.13 1.600032000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
5Package No 5 UC Berote (1.4M) 28 Excavator Work Bhan Koriati Road 0.4 29 2400' PCC Path 0.6 30 Khoni Rikhdi Road PCC 0.4 1.400028000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
6Package No 6 UC Berote (1.03M) 31 PCC Churian Lift Road Kou 0.4 32 Suply and Fixing 2.5" dia GI Pipe Santhi WSS Length 1500' 0.63 1.030020600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
7Package No 7 UC Boi (1.23M) 33 Cleanning & cutting of road seri khurd to chola, neeli kalam to dana, ziarat to iqbal house 0.3 34 WSS Badalkandi to satian di bandi Aziz house Boi -II 0.33 35 New road cutting chak to sirla 0.3 36 Cleanning & cuttin fo road Makreela masjid to Riyali, Mullan doga to daandi, makreela to maari primary school 0.3 1.230024600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
8Package No 8 UC Boi (1.20M) 37 PCC deedal katha to haji fareed house 0.2 38 New shingle road bandi taro gali to Satlarri 0.2 39 PCC Malikan taki to Gohallan 0.2 40 PCC Mubarak house to Aurangzeb house 0.2 41 PCC Naka to kamar Gran Bagla & Naka road to Jamil bandi kasi 0.2 42 PCC near Nawaz house Choyan Deedal 0.2 1.200024000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
9Package No 9 UC Chamhad (1.50M) 43 WSS Daldar Patian 0.2 44 Shingle road Bucha gali 0.15 45 H/pump c/o Nazakat chamhad 0.15 46 PCC Road Burj 0.2 47 PCC street Moh: Dotaria Kasaki 0.2 48 PCC Road Durbarh Bhurj 0.2 49 PCC Road Moh: Tariq SP Thana Khurd 0.2 50 PCC Road Sar Bangla 0.2 1.500030000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
10Package No 10 UC Chamhad (1.650M) 51 PCC Path khani thahhara sar pangla 0.1 52 Shingle Road Moh: Shakil Bisala 0.15 53 PCC Street Moh: Garhi Chamhad 0.15 54 PCC street Baghdara 0.15 55 B/I of H/pump M. Bashir Marhi Danna 0.13 56 PCC street Fatha Bandi 0.12 57 Hand Pump Moh: Sajid Murado Dera 0.13 58 Water Tank near h/o Master Ishfaq Fateh Bandi 0.1 59 Hand pumps for uc chamhad 3 nos 0.39 60 WSS Moh: Ali Bahdur Khan(Rs.0.100M) and PCC Moh: Bashir Dhari Beram Gali(Rs.0.130) 0.23 1.650033000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
11Package No 11 UC Dalola (1.90-0.5=1.40M) 61 Dug Well Dara Jaliari 0.25 62 WSS Reen 0.3 63 (SCHEME CANCELLED) 64 Shingle Road from Nalla Siali to Darekan 0.15 65 PCC Link Road Mujaffa 0.3 66 PCC Path uddi Nakka 0.15 67 (SCHEME CANCELLED) 68 WSS Fareed Abad Dalola 0.25 1.400028000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
12Package No 12 UC Dalola (1.535-0.555=0.98M) 69 PCC Road Suffian Narhoka 0.15 70 Shingle Road Treda 0.15 71 PCC Road Nakka to Farooq Abad 0.23 72 (SCHEME CANCELLED) 73 (SCHEME CANCELED) 74 Pcc Road i/c Retaining wall Bala Dalola 0.225 75 Pcc Road Talak Band Dalola 0.225 0.980019600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
13Package No 13 UC Dhamtour 76-79 (1.90M) 76 PCC Road Nagaki 0.6 77 PCC/R/Wall Takia Camp 0.4 78 PCC Road Aurangzeb Khan Gogra Maira 0.2 79 PCC Banda Said Khan 0.7 1.900038000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
14Package No 14 UC Dhamtour 80-82 (1.23M) 80 PCC Road Shakir Maira Dolat Khan House 0.15 81 PCC Street Masjid to Hadi House 0.38 82 widning and Pcc Road Pulli to Masjid uc Dhamtor 0.7 1.230024600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
15Package No 15 UC Goreeni 83-87 (1.3M) 83 PCC main road to Upper danna Qasid house Danna 0.3 84 PCC Street Hall Masjid Jabran 0.2 85 Pipeline Padherni Banwari 0.25 86 Pipeline Sonja Banwari 0.3 87 PCC street Ntain to Ateeq house 0.25 1.300026000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
16Package No 16 UC Goreeni 88-92 (1.13M) 88 PCC street main road to Master zaheen house Bawad 0.2 89 PCC street hall road Jabran Tasleem house 0.2 90 PCC upper kambi faroq house road 0.23 91 Cutting of road dungi kassi Jabran 0.25 92 Protection wall road Tariq house to saqib house 0.25 1.130022600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
17Package No 17 UC Jarral 93-96 (1.3M) 93 Bucha Sani Road PCC 0.4 94 PCC Path from Jabbi Saddique house to Rohal House v/c Kholiala 0.2 95 PCC from Chishma to Abudl Aziz House 0.3 96 PCC & R/Wall from Kutnali Maddrass to Matloob Shah House Kutnali 0.4 1.300026000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
18Package No 18 UC Jarral 97-98 (1.13M) 97 PCC from Ali Muhammad House to Kumaran Gali Kholiala 0.53 98 PCC Jabbri c/o Ali Asgher v/c Jarral 0.6 1.130022600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
19Package No 19 UC Jhangi 99-105 (1.85M) 99 PCC Drain Jamia Masjid Dobathar 0.2 100 PCC road Banda khair ali khan 0.1 101 PCC Banda khair ali khan near Mehboob house 0.15 102 PCC road near Jamia Masjid 0.15 103 PCC street Moh: bagh Mubashar, zubair 0.15 104 PCC road Daban da doga 0.1 105 PCC road villag Dobhatar 1 1.850037000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
20Package No 20 UC Jhangi 106-113 (2.01M) 106 Main Road Banda Khair Ali Khan 0.3 107 PCC street Jhangi c.o Hanif 0.45 108 PCC Road Boi de Gali c/o Saeed 0.4 109 Installation of Hand pump Boi di Gali Pervez Abbasi 0.15 110 PCC street No.1 Arbab lane 0.15 111 PCC street No.2 Arbaba lane 0.28 112 P/I of Hand pump Village Dobathar Shafiqu/complex 0.15 113 PCC street c/o Amjid 0.13 2.010040200 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
21Package No 21 UC Kuthiala 114-120 (1.88M) 114 B/I of H/pumps Moh: Younis Paswal, Moh: Dr Abid Hussain, Moh: Babu Shamrez, Moh: Babu Rawai, Moh: Tanveer, Babu Aftar Banj Gali 0.68 115 WSS Village Moharian 0.2 116 Breast Wall Link Road Bega Kot to Banj Gali 0.2 117 Imp and PCC Link Road Chariala 0.2 118 Imp and PCC Link Road Missar 0.2 119 Imp and PCC Link Road Dhaki to Sabir (Rtd) Principal 0.2 120 PCC Street Moh: Sjaikot and Banda Awan 0.2 1.880037600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
22Package No 22 UC Kuthiala 121-126 (1.25M) 121 PCC Street Moh: Chanzeb Treda 0.2 122 PCC Street Nawaz house to Ishaq House 0.2 123 B/I of hand pump Moh: Shamrez Banj Gali 0.15 124 Construction of shingle road Mohallah Peeri Paswal C./O Fiaz Councilor 0.4 125 Installation of 1 No. of Hand Pump at Mohallah Mushtaq Salyot 0.15 126 Installation of 1 no. of Hand Pump at Mohallah Sajid Hussain Banj Gali 0.15 1.250025000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
23Package No 23 UC Kukmong 127-133 (1.35M) 127 WSS tanb Bagh Seeri Talkandi 0.3 128 Extension of Shingle road Haryala ziyarat to Moh: dong 0.2 129 PCC road, main road chal gali to goher rehman house 0.15 130 Dozer Work at all local Roads 0.2 131 R/Wall marhase to upper chotri road 0.15 132 Repair & maintanence & extension of WSSs in v/c upper kukmong 0.15 133 PCC main road to Taj House 0.2 1.350027000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
24Package No 24 UC Kukmong 134-139 (1.38M) 134 Water distribution tank at Dhand sehr gran kukmar thupla basti 0.3 135 Repair WSS Naryad 0.25 136 Cleanness of Shingle road, lower Riyali to Nazir house 0.15 137 PCC Jabra to Qalandar House 0.2 138 Shingle road, Naryat main road to Masjid Naryat 0.18 139 WSS for Kathyala 0.31.380027600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
25Package No 25 UC Lora 140-141 (0.93M) 140 PCC road Moh: kairi Sairi 0.53 141 WSS Nursery numb lora 0.4 0.930018600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
26Package No 26 UC Lora 142 (1.5M) 142 H/Pump 10Nos Lora 1.5 1.500030000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
27Package No 27 UC Malikpurra 143-144 (1.737M) 143 B/I of Hand Pumps 10 Nos u/c Malikpura 1.537 144 PCC Street Near h/o Mastar Younis Khan to h/o Master Abdul Rasheed Moh: Chinnar Masjid Upper Malikpura and Bilal Masjid to h/o Bashir Hussain Shah 0.2 1.737034740 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
28Package No 28 UC Malikpurra 145-144 (2.1M) 145 Protection Wall Cristian Colony near Police line Abbottabad 0.6 146 PCC Street Bilal Masjid to Hujra near Eid Gah 0.5 147 const of Community Center near Police Line Maira Lower Malikpura 1 2.100042000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
29Package No 29 UC Mirpur 148-154 (1.39M) 148 PCC street vc III Islamkot & maira muzafar 0.3 149 PCC street link road mirpur c/o Dr. shamraiz 0.1 150 PCC street of beer C/o Anwar khan 0.2 151 PCC street karak maira c/o sher afzal qureshi 0.2 152 PCC streets of Banda nabi 0.2 153 PCC streets of Maira tal 0.2 154 PCC street mirpur kalan c/o Ishfaq Ashraf & M.Saleem 0.19 1.390027800 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
30Package No 30 UC Mirpur 155-164 (1.497M) 155 Stairs opposite APS c/o Arshad khan 0.2 156 Repairing of community center shoaib zai 0.2 157 PCC street maira mirpur c/o Arshad khan & M. Afsar 0.2 158 PCC street Musazai colony c/o atif khan & wasiq 0.2 159 Const of Wall ochaar vc III c/o Fareed ustad 0.1 160 PCC street Molakheil javed khan 0.05 161 PCC street amjad khan musazai 0.05 162 PCC street c/o Babu Alaewal 0.047 163 Hand Pump Niaz Abbassi Moh: Mirpur Maira Near Imtiaz General Store Mirpur 0.15 164 PCC road Allam Iqbal town, Dayri Qazia road Mandian Abbottabad 0.3 1.497029940 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
31Package No 31 UC Nagri Tutial 165-166 (2.0M) 165 PCC road chinali to Damyal 1.5 166 PCC road chinali to Dana 0.5 2.000040000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
32Package No 32 UC Nagri Tutial 167-168 (1.13M) 167 PCC paths batangi village 0.43 168 Pcc paths Batangi village internal 0.7 1.130022600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
33Package No 33 UC Nambal 169-173 (1.7M) 169 Const of PCC Road Tarrach 0.4 8000 Nambal 170 Const of Shingle Road Karnota 0.3 6000 Nambal 171 DWSS Leeran HDPE 32MM 0.3 6000 Nambal 172 Const of Shingle Road Tarhatti 0.4 8000 Nambal 173 Const of PCC Road Amjad Abbassi Galian 0.3 6000 Nambal 1.700034000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
34Package No 34 UC Nambal 174-179 (1.53M) 174 Const of Shingle Road Zamiri Kot 0.3 175 Const of PCC Road Nammal 0.43 176 Dozer work B.Bagla road 0.15 177 Dozer work leera road 0.1 178 WSS maintenance Cham 0.05 179 Construction of shingle road Nakheter 0.5 1.530030600 20-Jun-2019 11:30:00 NIL Download BOQ
35Package No 35 UC Palak 180-182 (1.43M) 180 PCC Path Gali Bazar to Jamia Masjid to Maqbool House, Aurangzeb house to Faisal House, Asif House to Masjid Sami House, Sohrab House to Sajjab House Gali Bazar 0.53 10600 Palak 181 PCC Path Muhammad Abad , Ameer -e Mawia Masjid to Bashir House, Liaqat House to Faheem, Uzair House, Riala Road to Fida House Parian 0.4 8000 Palak 182 Dozer/Excavator/ PCC Road Gali Kabeela to Darra Retining/Wall as required 0.5 10000 Palak 1.430028600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
36Package No 36 UC Palak 183-187 (1.3M) 183 Water Tank for Kabeela/WSS Village 0.3 184 WSS for VC Palak 0.4 185 Water Storage Tank and Pipe for Village Malach, Napali andadjacent Areas 0.3 186 B/I of Hand Pump Koza Gali Palak 0.14 187 PCC Loharan Khaiter Parwaza Palak 0.16 1.300026000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
37Package No 37 UC Pattan Kalan 188-189 (1.43M) 188 PCC road Qureshi house sonda to Razzaq house 1 189 Pro/Installation of upper birwala to shabbir house gandyala 0.43 1.430028600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
38Package No 38 UC Pattan Kalan 190-191 (1.0M) 190 PCC road riaz houe bagla 0.5 191 PCC road, Tariq house to sheraz (late)house 0.5 1.000020000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
39Package No 39 UC Pawa 192 (1.5M) 192 PCC road Moh: Malikabad (Haroon) 1.5 1.500030000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
40Package No 40 UC Pawa 193-200 (1.23M) 193 PCC street Solan pain 0.1 194 Water source cemented tank wasif Moh: Thallah bandi phullan 0.1 195 PCC street banda jaggian 0.1 196 Shingle road Mr. Naeem Sb Sargal 0.2 197 Shingle road Mr. Subaidar nazeer sb sargal 0.2 198 PCC street Mr.Adil sattar kakot 0.1 199 Shingle road main road to Junaid house harida nakaa 0.13 200 Community Center for Talhar u/c Pawa 0.3 1.230024600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
41Package No 43 UC Phallah 203-208 (1.23M) 203 Const of road kangar mera to lanjian 0.33 204 PCC road M.safdar khan pesar 0.15 205 Const of road sekhi patti pesar 0.15 206 Extension of road ghora hundia road rai 0.2 207 Const of road Moh: karam Elahi charbat 0.2 208 PCC kassi to House of shabirr Ahmed charbat 0.2 1.230024600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
42Package No 44 UC Phallah 209-212 (1.20M) 209 Const of road senri Rai 0.3 210 Extension of road Molvi Muhabat khan chinkot 0.2 211 PCC/Wall shop of Asjid to House of Jameel 0.45 212 PCC Sherpur road 0.25 1.200024000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
43Package No 45 UC Pind Kargu Khan 213-216 (1.73M) 213 Water supply Bisala i/c motor etc 0.3 214 WSS Sharoola & Bagarian i/c Motor Pump etc 0.5 215 WSS Pind kargu khan from minni tube well 0.5 216 WSS Darra manna, Badyal HD pipe 0.43 1.730034600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
44Package No 46 UC Pind Kargu Khan 217-221 (1.4M) 217 PCC paths Dhakian karry HD pipe 0.3 218 New const of path gali saran 0.4 219 WSS HDP pumps 0.4 220 WSS/ Hand pump VC-I 0.15 221 PCC Path Seri Sher Shah 0.15 1.400028000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
45Package No 47 UC Seer Gharbi 222-223 (0.65M) 222 PCC road pattan 0.35 223 PCC road Malhana 0.3 0.650013000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
46Package No 48(i) UC Seer Gharbi 224-227 (1.78M) 224 PCC Road Hothala 0.95 225 WSS reaping uper pand seer 0.4 226 New link road batnara 0.25 227 New link road mera 0.18 1.780035600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
47Package No 48(II) UC Seer Sharqi 228-231 (1.30M) 228 Rehab & Widening of Road Village Dhagan 0.3 229 PCC Of Road fro Nakar to Bagiyan Seer Sharqi 0.5 230 PCC Paths for Village Kalaban(3Nos) Road to House Zaheed, Abid, Saleem 0.3 231 PCC Path for Village Taror 0.2 1.300026000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
48Package No 49 UC Seer Sharqi 232-235 (1.13M) 232 1No Water Bor H/pump for Moh: Qazi Danna Village Taroor 0.15 233 PCC Path from Upper Chtala to Azlan form house 0.2 234 WSS for Village Kalas (Moh: Uppr and Lower Chitala 0.6 235 Remining Work Jandala Road Chkarian 0.18 1.130022600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
49Package No 50 UC SheikhulBandi 236-240 (1.38M) 236 PCC street Moh: jalalabad sheikhulbandi 0.3 237 PCC Street Gul Hameed Khan Gravyard to Hanif Khan house. 0.25 238 Culvert at Moh: khooi 0.2 239 H/Pump 02Nos Sheikhulbandi 0.35 240 H/Pump 02Nos Sheikhulbandi 0.28 1.380027600 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
50Package No 51 UC SheikhulBandi 241-245 (1.05M) 241 Repair & Maintenance of Hujra Banda jalal Ilyas khail 0.4 242 Sewarage Line 18'', PVC Pipe from Saeed House to Shoukat House. 0.3 243 P/wall at Jugian Nallah 0.15 244 PCC Street Mohalah Seeri 0.15 245 PCC Street near h/o Sultan ul Arfeen Bari Sheikhulbandi 0.05 1.050021000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
51Package No 52 UC Namli Maira 246-248 (1.15M) 246 PCC link road Dhaki kheter to 0.4 247 PCC/link road Malach to kala Munda 0.3 248 Shingle road Sangi Maira 0.45 1.150023000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
52Package No 53 UC Namli Maira 249-251 (1.0M) 249 PCC/Stairs Mohallah Hill 0.35 250 Shingle road Dakhan to Ghooni 0.35 251 WSS rPCC tharyati masjid road & wall 0.3 1.000020000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
53Package No 54 UC Kuthwal 252-253 (0.3M) 252 Pcc mohalla Kehnian chetri uc kathwal 0.2 253 Maintenance of WSS Safeid pani uc kathwal 0.1 0.30006000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
54Package No 55 UC Kakul 254 (0.3M) 254 WSS (Tank & Pipe) at Village Bamlial u/c Kakul (Phase-II) 0.3 0.30006000 20-Jun-2019 11:30:00As per work orderNIL Download BOQ
TERMS & CONDITIONS:-  
1. All the bidding will be through E-Bidding system. Tender form /BOQ can be filled and downloaded by the original contractor available on the official web site of LG&RDD. DG Office (www.lgkp.gov.pk) Khyber Pakhtunkhwa after one day of publishing of NIT in newspaper.
2. The contractors are required to fill the tender form and BOQ online as per e-bidding and submit a hard copy of the same copy to the AD Office Abbottabad. The original and duplicate copies of tendered documents clearly marked as original and duplicate in the name of concerned Assistant Director LGE&RDD respectively (sealed in envelope) must be submitted to concerned Assistant Director Office. The tender must reach this office up to fix date and time as mentioned.
3. The following documents must be attached with bids:
 (1) Enlistment and renewal copy in LG&RDD for the year 2018-19
 (2) Photocopy of CNIC
 (3)  Pakistan Engineering Council Uptil June 2019 
4. Tender documents of bidders if found bogus/false documents will be rejected and their registration shall stand cancelled/ blacklisted in addition of forfeiture of earnest money and security amount (if any).
5. No tenders are acceptable through fax/by hand. Sealed bids sent through registered mail/couriers service should reach up to the specified time and date. The contractor or his representative with power of attorney may be present at the time of opening of tender.
6. Any contractor/firm are bound to mention rates as per notification No. KPPRA/M&E/Enstt:/1-5/2016 “Above/Below system”.
7. The bidders who offer their bid more than 10% below of the estimate cost will have to enclose additional 08% of the estimated amount in shape of call deposit in the name of Assistant Director LG RDD Abbottabad with tender documents otherwise the bid will not be entertained. 
8. In case the bid becomes a tie the contractor shall be decided through a free toss which shall be final.
9. The time limit of each work shall be as per work order issued to successful bidder and the contractor will have to start work within 7 days time period after the issuance of work order failing which the work be cancelled and security/additional security(if any) will be forfeited.
10. The federal and provincial duties/stamp duty and taxes including sales tax will be recoverable as per directives of the government issued from time to time. 
11. The procuring entity may reject any or all bids after communicating the reasons for rejection at any time prior to the award of contract.
12. Any addition made in Terms and conditions in the NIT advertised in the newspaper will be implemented as per KPPRA Rules.
13. Work Order will be issued on the basis of availability of funds.
14. All material Testing and all sorts of tests will be performed by contractor on the demand of procuring entity.
15. At the time of tender opening/receiving work order the original contractor should be present or power of attorney on prescribed format should be furnished on demand of Assistant Engineer LG&RDD Abt.
16. All contractors should be enlisted with Khyber Pakhtunkhwa Revenue authority. In case the contractor is not enlisted his bid will not be considered.. 
17. The contractors who offered their bids online but do not send the hard copies or incomplete/defective documents, will be debarred from tendering process of Directorate General LG&RDD in the future and their case will also be sent to the competent forum for blacklisting. 
18. The contractor is bound to execute the work at his own. Any contractor fund sub-letting will not be tolerated and action will be taken against him and case will be forwarded for blacklisting. 
 