Work No | Work Name | Estimated Cost (Millions) | Earnest Money(Rs.) | Last Date / Time of Submission of Tender Forms | Date / Time of Opening | Time Limit | Address of NC / VC | Download BOQ |
1 | 1. Pav of street at Fayaz Korona Kamargai Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
2 | 1.constt:of path Fateh Husain Haji College Kalony Rs.200000/-
2.Pav: of Street/drains Mohd Riyaz/Gahni Kamargai Rs.100000/-
3. Danga wall Fida Ullah Rehankot Rs.200000/-
4. Cutting/PCC road islam chenar Muhalla Dir Rs.300000/-
| 0.8000 | 16000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
3 | 1.cosnt: of Danga Wall wazir rahman Kharaw bala Rs.200000/-
2.cosnt: of link road Said Lala Khawar mohalla rokan bala Rs.200000/-
3.cutting main road Kharawo payeen Rs.200000/-
4. link road/cutting sarpo mohalla rokhan bala Rs.400000/-
| 1.0000 | 20000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
4 | 1. link road/cutting dandosar rokhanRs.200000/-
2. constt: /cutting of Gasi road rokhanRs.300000/-
3. Link road c/o Bakhtbodin rokhan payeen Rs.300000/-
| 0.8000 | 16000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
5 | 1.Const: /PCC of Road at Rehankot Rs.800000/- | 0.8000 | 16000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
6 | 1. Danga Wall c/o Intikhab Alam KassRs.150000/-
2. Danga Wall Sahibzada Irshad Ullah Rehankot Rs.200000/- 3. Pav of street at Mohalla Kamil Colledge Colony Rs.300000/-
4. Pav of street c/o Mohd Zeeb Mistri Colledge Colon Rs.200000/-
| 0.8500 | 17000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
7 | 1. Pav of Street at Shaw/Bijligar Rs.750000/-
2. pav of street at Kotibasto Rs.300000/-
| 1.0500 | 21000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
8 | 1. PCC Road Kandawgay Rs. 500000/-
2. cosnt: /Pav of street Kalsho/serai Rs.500000/-
3. Const: of Danga wall Shoaib Rokhan Payeen Rs.100000/- 4. pav: of street Esa Khan Rs.100000/-
| 1.2000 | 24000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
9 | 1. Protection Wall c/o Naseem Stadium Mohalla Rs.100000/-
2. P/Wall c/o Ataurahman Kass Mohalla Rs.100000/-
3. const: of Danga wall /Path way Rehankot Adnan Korona Rs.202000/-
4. Pav: of street at Chinar Mohalla Rs.200000/-
| 0.6100 | 12200 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
10 | 1.Constt: of PCC road/Danga wall Rehankot Charahee Rs.300000/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
11 | 1.Retaining wall Mukhtiar Kalsho Dir Rs.150000/- | 0.1500 | 3000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
12 | 1. Road Alam Zeeb Korona Dir Urban Rs,200000/- 2.Danga Wall Amir Khan Korona Rehankot Rs,200000/- 3.Danga wall perveez Steadium Mohalla Rs, 200000/- 4. const: of Rehankot Road Rs, 200000/- | 0.8000 | 16000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
13 | 1.Danga Qadeer Kalay Anwarul Haq Rs.200000 | 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
14 | 1.Dug well Rehankot Bala Rs.155000/- | 0.1550 | 3100 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
15 | 1.Dug Well at College colony C/O irshad mehmood Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
16 | 1. Water Well Rahman Ghani (Nagha)=100000/- 2. 2Nos Water Well Hasan Tawn Rs.250000/- | 0.3500 | 7000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
17 | 1.Water Well at Bijligar =250000/-
2.Nos Water Well Rehankot Payeen Rs.500000/-
3. Water Well c/o Aftab Bijligar Korona Rs.150000/-/-
| 0.9000 | 18000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
18 | 1.7Nos Water Well at Dir Town Rs.1000000/- | 1.0000 | 20000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
19 | 1. W/Well at Masjid Taqwa Paraw Rs.150000/-
2. W/Tanks VC Kass Rs.500000/-
3. W/Tank VC Rehankot Rs.500000/-
4. W/Tanks VC Shaw Rs.500000/-
5. W/Tanks Serai Kalsho Rs.300000/-
6. WSS at Kotibasto c/o Anwar Zeeb Rs.250000/-
7. Tameer Spring Yousaf Abad Rs.150000/-
| 2.3500 | 47000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
20 | 1. Water well Imran Ullah at rehankot Rs,100000/- 2. Water Well yousaf khan kandawgay Rs,100000/- 3. Water Well Ala uddin Steadium Mohalla Rs,100000/- 4. Water Well said alam colledge mohlla Rs,100000/- 5. Water Well Abdul Manan Rs,100000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
21 | 1.constt: of Masjid Mataka c/o Sami Ullah Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
22 | 1. Constt:/Repair work at Shaw Masjid c/o Raees Ahmad= Rs.200000
2. Const: of Danga wall at Janazgah Bikary Rs.400000/-3. Cosnt:of Masjid Sori Paw Rs.200000/-
| 0.8000 | 16000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
23 | 1. cosnt:of Masjid/Madrasa Yousaf Abad Rs.200000/-
2. cosnt:of Madrass Amiri Kass Rs.200000/-
3. Solar System Masjid Chinar Mohalla Rs.200000/-
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
24 | 1. Cutting road Qadeer kalay Rs.170000/-
2. Danga Road Sheer Mohd Mastar Malok Khwar Rs.200000/-
3. Danga Malook khawar Bacha yousaf korona Rs 200000
| 0.5700 | 11400 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
25 | 1. cosntt:/cutting of Road Ghazigay Rs.500000/-
2.constt: of Road Qadeer Kalay Shahbaz Khan Rs.500000/- | 1.0000 | 20000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
26 | 1. DWSS Azmat Khan Mohalla Malook Khwar Rs.100000
2. DWSS Lal Mohd Mohalla Malook khwar Rs.100000
| 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
27 | 1.water well c/o sami Ullah Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
28 | 1.Solar System Mohd Abdullah Soona Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
29 | 1Kacha Road Sia Ghara Samkot c/o Ashfaq Rs.300000/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
30 | 1. const: of Madrassa Batal c/o Ali Khan Rs.200000/-
2. const:of Madrass Gorkohi Rs.300000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
31 | 1.Kacha Road Mohammad Zada Korona Palam Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
32 | 4.Nos Water Well at 1. Sahzamin Khan Korona Gamseer Rs.150000/-
2. Sardar Husain Korona Shalizara Rs.150000/-
3. Hasan Korona Shalizara Rs.150000 and
4.at V/C Jabar Khas Rs.150000/-
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
33 | 1 No Dug Well Gul Mula Khan Gamseer Jabar Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
34 | 1.Dug Well & DWSS at VC Jabar Irshad Ahmad Korona etc Rs.424920/- | 0.4200 | 8400 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
35 | 1Masajids Manzai Payeen/Bala/Eidgah Jabar Rs.600000/- | 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
36 | 1. cutting Road Janas Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
37 | Cosntt: of Samang road Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
38 | 1.Culvert /Danga Wall Shringal Road Rs.250000 2.Street at Samang Rs.50000
3.PCC Road Samang Rs.300000
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
39 | 1.water well Madrassa Shaoor Bala c/o Mohd Akbar Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
40 | 1. Dug well at Samang Rs.100000/-
2 Water Well Rs.200000
| 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
41 | 1. Purchase items for Falahi Tanzeem Dokai Sharingal Rs.300000
2. Madrassa Jamaiat Ul Mohsanat Lilbanat Rs.300000
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
42 | 1. purchase of 10Nos of W/Tanks plastic 2000 capicity Galons Rs.200000/-
2. DWSS at Sharigal Pipe 25mm Rs,100000/-
| 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
43 | 1. Constt: Cutting shah Islam Hayagay Shrqi Rs.200000/- 2. Danga wall Hayagay Garbi Rs.100000/-/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
44 | 1. Cutting Road Kochkal Saeed Jan Rs.200000/-
2. Constt: of Path Nasir Ullah Kotkay c/o Irfan Driver Rs.150000/-
3. Cosntt: of Danga wall Khan zarin Girgat Rs.100000/-
| 0.4500 | 9000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
45 | 1.Pav of Street at Hayagay Gharbi c/o Bakht Zada Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
46 | 1. pav: of street at VC Kotaky Rs.200000/-
2. Constt/cutting: of road at Rahimabad U/C Chukiatan Rs.200000/-
| 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
47 | 1.PCC Road Mohalla Tangai Bala Rs.300000/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
48 | 1. PCC Road Mohalla Khamba Amir Rahman/said rahman Rs.200000/-
2.PCC Road Fazal Raziq Mohalla Khamba Rs.200000
3.Danga Wall Ihtisham Alam Mohalla Kamba Rs.200000
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
49 | 1.water Well Nawo c/o Nasir Ullah Rs.200000/- | 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
50 | 1. Water Well Shair Ullah Khando Kass Rs.100000/- 2. (3Nos) Water Well Naway Khando Kass Rs.300000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
51 | 1.W/Tanks VC Kotay Rs.300000/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
52 | 1.constt: of Masjid Tango Dab Alla Rs.200000/- | 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
53 | 1. const: of Masjid Sar Patay Hayagy Gharbi Rs.200000/- 2. Cosnt work at Masjid Nawo c/o Khalid Rs.200000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
54 | 1.Const: work at Jamia Masjid Mohalla Khamba Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
55 | 1.cosntt: of path Madrassa qulandai Rs.200000/- | 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
56 | 1.cosntt: of PCC Road Sangar Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
57 | 1.pav of street Quladai Bala Korona Rs.300000/-
2. Pav: street Mumtaz Korona Qulandai Rs.200000/-
| 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
58 | 1. Danga Wall Ashafaq Panakot Rs.100000/-
2.Danga Wall javeed Panakot Rs.100000/-
3.Danga Wall Farman Ali Panakot Rs.100000/-
4.Danga Wall Shamsu rahman Panakot Rs.120000/-
| 0.4200 | 8400 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
59 | Yeno Kalay Bridge Nizam UddinRs.200000/-
2.Danga Wall Muqabar Khan Panakot Rs.100000/-
3.Danga Wall Liyaqat Amir Qashqaray Rs.100000/-
| 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
60 | 1. DWSS Qashqaray bala umar sadiq Rs.100000/-
2.DWSS Jarjoray zubair Rs.400000/-
3. DWSS at atrangoo Rs.200000/-
| 0.7000 | 14000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
61 | 1.Pipe/DWSS Said Bacha Korona Qulandai Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
62 | 1. Water Tank Mohd Ayaz Panakot Rs.100000/-
2.DWSS Ghayas Uddin Rs.100000/-
3. Ambreella DWSS Farooq Qulandai Rs.200000/-
| 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
63 | 1. const: of Madrassa Naway Kalay Dobando Dara Rs.200000/- | 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
64 | 1.Upgradation of Check Post /Main Gate in DC Camp Office Panakot Dir Upper Rs.700000/- | 0.7000 | 14000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
65 | 1. Masjid Sadiq Banda Said Mohd Rs.200000/-
2. Masjid Qashqaray Ghayas Uddin Rs.100000/-
3. Masjid Panakot Mushtaq Rs.110000/-
| 0.4100 | 8200 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
66 | 1.cosntt: of road Ayoray Rs.200000/- | 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
67 | 1. Rasta Fazal wahid Surbat Rs,100000/-
2. Rasta Nawab zada Surbat Rs,100000/-
3. Danga Wall Abdullah Surbat Rs,100000/-
4.RCC Culvert Bakht Alam Hatan 170000 | 0.4700 | 9400 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
68 | 1. Water well Yasir Shah Ganorai Rs.150000/- 2. Water well C/o Alam Zeeb School Rs.150000/-
3. Mohalla Khwar Ganorai C/o Sheer Baz Khan =100000/- 4. Water well Ganorai c/o Ihsan Ustaz Rs.100000/-
5. DWSS/Dug Well Mushtaq Korona Sadokai Rs.100000/-
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
69 | 1. Dug Well at Mohalla Haji Abad Abakand Rs.100000/- DWSS Abdullah Korona Surbat Rs.80000/- | 0.1800 | 3600 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
70 | 1. DWSS Farid ullah pacha kalay Rs,100000/- 2. Dug well Haji Rahmat surbat Rs,100000/- 3. Dug well Hasin Ullah Abakand Rs,100000/- 4. DWSS Syed Hamid Ganorai Rs,100000/-
5. Dug/well Ihsan Ullah Sadokai Rs,98000/-
| 0.4980 | 9960 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
71 | 1.Constt/ widening /danga wall at Eid gah Salamkot | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
72 | Cosntt: of Masjid surbat c/o Husain Ullah Rs.300000/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
73 | 1. cosnt: of Madrass/Masjid Sarko Hatan Dara Rs.200000/- 2. cosnt; of Masjid Haji Abad Abakand Rs.200000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
74 | Constt: of bath room Masjid Dherai Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
75 | 1. const: of road Gasi Rs.300000/
2. PCC Road Doodba Khashi Ullah Rs.250000/-
| 0.5500 | 11000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
76 | 1. WSS at U/C swani C/o Javid Rs 100000
2. Water well at Maulana Bakht Alam korona Rs 100000
| 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
77 | Water well Shaga c/o Saeed Khan Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
78 | (I)WSS at U/C Swani Rs 500000
(II)Dug wells at u/C Swani Rs,320000
(III) Dug well at dir Town C/o Zahidullah Rs 100000
(IV) Dugwell at Sahib abad Kotkay C/O Anwarullah Rs 100000
| 1.0200 | 20400 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
79 | 1.water well bibiawar c/o Maulana Rafiuddin Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
80 | 1.Water Well c/o Akhmad Munir Ustaz Amlooknar rs.100000/-
2. Water Well Unkar c/o Baram Khan Rs.100000/-
| 0.2000 | 4000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
81 | I. Dug Well Ashrafuddin Korona shamorgar Rs 95000 (II)DWSS Sail Kas samiullah Korona Rs 95000
(III)DWSS Jalil Korona Serai Rs 95000
(IV)Dug Well Wahid Gul Korona Mano Banda Rs 95000
(V) DWSS Rahatullah korona Baz Kamar U/C Bibyawar Rs 90000
(VI) dug well Ghlam rahman korona shamorgar Rs 95000 (VII)DWSS Molvi Saeed Jan korona Amloknar U/C Bibyawar Rs 95000
| 0.6600 | 13200 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
82 | 1.Dug Well Wahid Ullah Korona Bibiawar Rs.300000/- | 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
83 | 1. Cosntt:/Repair of Mosque at Terbat Rs.200000/-
2. Cosntt:/Repair of Mosque Ghwajo Awara Kair Rs. 200000/-3. Cosntt:/ Repair of Mosque at Kass Amlok Nar Rs.200000/-
| 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
84 | Constt: of Madrass Hazrat Usman Bin Afan Qari Hayat Ullah Korona Rs.380000/- | 0.3800 | 7600 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
85 | 1.PCC road in V/C Tarpatar Rs,200000/-
2.PCC road in U/C Gandigar c/o Ilyas khan Rs,100000/-
3. Culvert in U/C Tarpatar Rs,300000/- | 0.6000 | 12000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
86 | 1. Pav of street Awarai Mohd Idrees Rs,200000/-
2. Pav of street landai sha Khyal Mohd Rs,200000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
87 | 1. Pav of street landai sha payee Noor Ullah Rs,200000/-
2. Pav of street Katan payeen Haji Mohd Rs,100000/-
3.PCC road landai sha payeen Hazir rahman Rs, 100000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
88 | Water Well Mian Ghulam Rashid Gandigar Rs.100000/- | 0.1000 | 2000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
89 | 1. Masjid Qasamy Katan (P) Zeer Rahman Rs 210000/-
2. Masjid Serai Kass Darora Amir Bacha Ustaz Rs,300000/ | 0.5100 | 10200 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
90 | 1. DWSS in U/C Tarpatar Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
91 | 1. cosnt: of Masjid Almas Rs. 300000.
2. cosntt: of Madrass Tarpatar Rs.200000/-
| 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
92 | 1. Const of Masjid in U/c Tarpatar Rs,100000/-
2. const: of Masjid in u/C palam c/o Haji Ahmad Rs,100000/-
3. Const:of Masjid in V/C Aligasar c/o Hanif Ullah Rs,100000
| 0.3000 | 6000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
93 | 1.Solar System /Missing facilities/ equipments for labour room at BHU Pashta Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
94 | Solar System /Missing facilities/ equipments for labour room at BHU Jellar Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
95 | Solar System /Missing facilities/ equipments for labour room at BHUSundal Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
96 | Solar System /Missing facilities/ equipments for labour room at BHU Daskor (B) Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
97 | Solar System /Missing facilities/ equipments for labour room at BHU Jabar Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
98 | Solar System /Missing facilities/ equipments for labour room at BHU Baradara Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
99 | Solar System /Missing facilities/ equipments for labour room at BHU Batal Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
100 | Solar System /Missing facilities/ equipments for labour room at BHU Barikot Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
101 | Solar System /Missing facilities/ equipments for labour room at BHU Matoor Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
102 | Solar System /Missing facilities/ equipments for labour room at BHU Kairdara Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
103 | Solar System /Missing facilities/ equipments for labour room at BHU Bilachand Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
104 | Solar System /Missing facilities/ equipments for labour room at BHU Janbatai Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
105 | Solar System /Missing facilities/ equipments for labour room at BHUShahikot Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
106 | Solar System /Missing facilities/ equipments for labour room at RHC Sheringal Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
107 | Solar System /Missing facilities/ equipments for labour room at RHC Nehag Bandai Rs.400000/- | 0.4000 | 8000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
108 | Constt: of road to saidgai Usherai Dara Rs.2000000/- | 2.0000 | 40000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
109 | Beautification and installation of billboard/signboard for in different gate ways of valleys in Dir Upper Rs.1000000/- | 1.0000 | 20000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|
110 | Constt/widening of road at U/C Swani Rs.500000/- | 0.5000 | 10000 |
24-Apr-2019
| 11:30:00 | As per work order | NIL |
Download BOQ
|